File:Robalocommissioning.jpg

From Researchandideas
Revision as of 05:02, 4 April 2022 by Pickens (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Original file(740 × 605 pixels, file size: 60 KB, MIME type: image/jpeg)

The commissioning of the USS Robalo. After six months of sea trials in Lake Michigan, commissioning ceremonies take place on board USS Robalo on September 28, 1943. There was no St. Lawrence seaway until the 1960's so the fresh water submarines had to be transported down the Mississippi River. Gato class submarines had a minimum draft of 12 feet but could be transported through Chicago and the 9-foot-deep Chain of Rocks Channel near the confluence of the Mississippi and Missouri Rivers by carrying the submarines in a floating dry dock.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:56, 27 May 2012Thumbnail for version as of 16:56, 27 May 2012740 × 605 (60 KB)Pickens (talk | contribs)The commissioning of the USS Robalo.

The following page uses this file: